Write the criteria or you did not delegate
Loads, movement, thermal criteria, and attachment points belong in the section. The delegated engineer should not have to guess the drift limit. Missing criteria return as an RFI and a schedule hit.
Say what the architect still designs: the profile, the sight lines, the waterproofing concept. Split the responsibility in sentences.



