Sta 0+00 to 6+50, MH-1 to MH-5 Survey levels
Ground line plotted from 66 survey points Survey levels
8" PVC at 0.40% to 1.10%, slopes labeled per run Design inverts
Match line to C-302 at Sta 6+50 Sheet layout
Profiles built from your survey and design levels
Attach the survey levels as a spreadsheet or points file, the alignment, and the design inverts or road grades. Nomic draws the existing ground line, the design line, every structure at its station, and the profile grid and band with stations, levels, and slopes, split into sheets with match lines.
- Existing ground and design lines plotted from your levels
- Structures drawn at their stations with rim and invert labels
- Stations, levels, slopes, and lengths in the profile band


