6" SDR 35 PVC sanitary at 1.00% to MH-1 Markup p. 2
2" domestic and 6" fire service with RPZ in hot box P-001
18 storm structures placed and labeled C-301 grading
Existing 8" water main tapped per survey location Survey
Utilities drawn on the site plan from the civil design
Attach the civil engineer's markups or design sketches, the survey with existing utilities, and the grading plan. Nomic draws each system on your civil layers with pipe labels for size, material, and slope, places structures with their labels, and runs services to the building at the points the plumbing and electrical engineers show.
- Domestic water, fire service, hydrants, valves, and backflow assemblies
- Sanitary laterals, cleanouts, and manholes with inverts and slopes
- Storm inlets, pipes, and outfalls plus electric, telecom, and gas routing


