What Is a Grading Plan?

Last reviewed: November 2026

A grading plan is a civil drawing that shows the existing ground contours, the proposed finished elevations, and how the site will drain. It also shows the limits of cut and fill, slopes, and retaining walls, so the contractor can shape the earth and the jurisdiction can review it.

Shows
Existing and proposed contours, spot elevations, and slopes
Also shows
Drainage paths, retaining walls, and the limits of cut and fill
Prepared by
A civil engineer or licensed surveyor, depending on the jurisdiction
Usually required for
Grading permits and many building permits
Often paired with
Drainage calculations and an erosion control plan
Variants
Rough grading plan and precise or finish grading plan

Definition

Grading Plan

A grading plan describes how the ground will change. Contour lines show existing elevations, usually dashed and light, and proposed elevations, usually solid and heavier. Spot elevations call out the finished level at pads, corners, curbs, drains, and the tops and bottoms of walls. The plan shows where earth is cut and where it is filled, the slope of banks, the route water takes across the site, and what happens at the property line. Most jurisdictions require one with a building or grading permit, and they publish checklists that name what they expect to see.

In depth

What a grading plan contains

The core of a grading plan is its contours. Existing contours show the ground as surveyed, and proposed contours show the ground after construction. Where a proposed contour meets an existing one, the plan marks the limit of grading, often called the daylight line. Spot elevations at pads, corners, drains, curbs, and wall tops give the contractor numbers where contours would be ambiguous.

Other items sit on the same sheet. Slope ratios and benches on cut and fill banks, drainage flowlines, swales, inlets, and pipes show where water goes. Retaining walls have top and bottom elevations. Property lines, easements, setbacks, and existing utilities and structures give the context, along with the scale, north arrow, legend, and general notes.

Why drainage is the part reviewers read first

Grading is mostly about water. The plan should show every lot or pad draining away from structures, to a defined outlet, without sending runoff onto a neighbor. Reviewers check the slope away from buildings, the outlet for each drainage area, and whether runoff from offsite crosses the property.

A grading plan that moves earth correctly but leaves a low spot against a foundation is the usual source of a correction. The fix is a spot elevation and a flowline, and the time to catch it is at plan review rather than after the pad is graded.

Cut, fill, and earthwork quantities

Many jurisdictions ask for the volume of cut, fill, import, and export, commonly in cubic yards, along with remedial earthwork called for by the geotechnical report. The numbers matter beyond the permit. They drive the earthwork bid and the number of truck trips, and a plan that is out of balance means soil must be hauled on or off the site.

The quantities come from comparing the existing and proposed surfaces. When the grading plan changes during design, the earthwork quantities need to change with it, and mismatches between the plan and the estimate are a common pricing dispute.

Rough grading and precise grading

A rough grading plan covers the bulk earthwork that shapes the site: pads, slopes, and major drainage. It usually comes first and supports the grading permit. A precise or finish grading plan sets the final elevations for paving, walks, and landscape after the site is roughed in.

Some jurisdictions require both, with different checklists and sign-offs. The project should know which one the permit calls for, because an incomplete plan is returned as a correction and holds up the start of work.

What plan reviewers check

Reviewers use a published checklist. Typical items include scale and legend, existing and proposed contours, spot elevations, slopes within allowed limits, drainage paths and outlets, retaining wall details, quantities, and the engineer’s stamp. Each jurisdiction names its own requirements, so the checklist for the permit counter beats a general template.

Because the plan relates to the site plan, the geotechnical report, the drainage calculations, and the architectural plans, the review is a cross-document check. The finished floor elevation on the building plans should match the pad elevation on the grading plan.

Examples

Grading Plan on a real project

  • 01

    A civil engineer shows existing contours as dashed lines and proposed contours as solid lines, with spot elevations at each pad corner.

  • 02

    A reviewer returns the plan because the finished floor elevation on the architectural plans differs from the pad elevation on the grading plan.

  • 03

    A rough grading plan supports the grading permit, and a precise grading plan follows once the pads are established.

Tooling

Where AI helps with grading plan review

A grading plan review is a checklist matched against a sheet and its companion documents. The questions are whether the plan shows what the jurisdiction asks for and whether the numbers agree with the site plan, the geotechnical report, and the architectural plans.

Nomic reads the drawings and the jurisdiction checklist a team provides and cites the sheet behind each finding. It does not design the grading or stamp the plan, and the civil engineer of record remains responsible for it.

Compare AI tools for plan review

Best AI Plan Review Software in 2026

FAQ

Frequently asked questions

A grading plan is a civil drawing that shows existing and proposed ground elevations, how water will drain across the site, and the limits of cut and fill. It guides the earthwork contractor and is reviewed as part of a grading or building permit.

Existing and proposed contours, spot elevations, slopes, drainage paths and outlets, retaining walls, cut and fill limits, earthwork quantities, property lines, easements, setbacks, a legend, a north arrow, and notes. The jurisdiction’s checklist names what it expects.

A site plan shows where buildings, paving, and utilities go on the property. A grading plan shows the elevations and drainage of the ground those things sit on. The two are coordinated, and the building’s finished floor elevation should match the grading plan.

Rough grading shapes the bulk earthwork, such as pads, slopes, and major drainage. Precise grading sets the final elevations for paving, walks, and landscape after the site is roughed in.