42 partitions to be removed, keyed D1 Existing EX-103
11 doors, frames, and hardware removed, keyed D3 Photos 041-088
Break room casework salvaged to owner, keyed D6 Markup p. 1
Corridor wall at grid 4 to remain, rated 1 hr Life safety plan
Demolition drawn from the existing conditions and the photos
Attach the existing conditions DWG, the site walk photos, and the new floor plan. Nomic marks each wall, door, ceiling, and fixture as to remain or to be removed, tags removals with your keyed demolition notes, and reads panel labels and nameplates in the photos so the MEP demo sheets name real circuits and equipment.
- Removed items dashed and tagged, items to remain left solid
- Keyed notes for partitions, doors, casework, finishes, and ceilings
- Electrical, mechanical, and plumbing demo with circuits and equipment named


