Pick up the contractor's as-built set and check every mark was drafted.
- 412 of 418 marks drafted into the DWGsAs-built set
- RFI 112 footing depth change drawn on S-101RFI 112
- Door 214B added per CO-07, door schedule updatedCO-07
- Pencil note at P-201 riser 4 illegibleP-201
Every field mark read and drafted into the DWGs
Attach the scanned field set or the Bluebeam markups, the construction DWGs, and the RFI, ASI, and change order logs. Nomic reads hand marks and markup comments, edits the matching DWG, and follows referenced RFIs and ASIs to the drawing they changed. Marks it cannot read are listed with the sheet and location rather than guessed.
- Scanned hand redlines and Bluebeam markups read sheet by sheet
- RFI, ASI, and change order references traced to the affected sheets
- Illegible or ambiguous marks flagged for the contractor or design team