Use the contract's words
AIA language often distinguishes as-built markups from record drawings. A spec that says as-built when it wants a compiled record set will be bid one way and enforced another. Edit the closeout section so one party owns each deliverable.
A conformed set during construction, which folds in changes so far, is a third thing. It is not the final record.