Purpose stamps stop the wrong set from reaching the field
A 90% review set, a permit set, and a bid set can all be "the latest PDFs" in someone’s inbox. The purpose line in the title block tells a reader what decision the issue supports. Issued for review invites comments. Issued for bid invites a price. Issued for construction invites work in place. Mixing them is a documentation error with a cost.
Good practice is one conformed set: the IFC sheets physically or digitally include addendum changes, with revision clouds and a revision schedule. Handing the field a bid set plus a separate addendum binder asks every foreman to perform document control. Some will. The wall does not care which ones did.



