AEC definitions

What Is a 90% CD?

Last reviewed: September 2026

A 90% CD is a construction document set that is nearly complete: drawings coordinated, specifications written, and schedules filled, issued for a final review before the team seals the set for bid or permit.

Stands for
90 percent construction documents
Purpose
Final interdisciplinary and owner review before issue
Specs
Project manual essentially complete
What 100% adds
Comment incorporation, seals, and bid or permit administration
Too late to add
New scope, unless the owner accepts a redraw and a new estimate
Often issued with
A permit set, a bid set, or both, after comments close

Definition

90% CD (90 Percent Construction Documents)

Ninety percent is the last gate where an owner can comment without pretending the set is still in design. Details should be drawn, specifications edited to project conditions, and consultant drawings coordinated with the architectural sheets. The remaining 10 percent is incorporation of review comments, sealing, and the administrative sheets a permit or bid set needs. A 90% package that still has blank details or outline specifications is a 60% set with a wrong label, and the bid that follows it will be full of allowances and RFIs.

In depth

What "nearly complete" has to mean

Every sheet that will be in the bid set should exist, including details, schedules, and diagrams. Door, finish, equipment, and panel schedules should be filled from the plans, not left as column headers. Specification sections should be edited, with products and execution matched to the drawings. Cross-references between a detail bubble and a sheet number should resolve.

Quality control at this gate is comparison work. Does the wall type on the plan exist in the partition schedule? Does the spec section cited on the drawing exist in the project manual? Does the structural general note still describe a slab the architectural section abandoned at 60%? Those mismatches survive into the bid set when nobody reads across documents.

Permit sets and bid sets split after this review

Some owners submit for permit at 90%, accepting that the permit set and the bid set may diverge by an addendum. Others wait for 100% so the authority having jurisdiction and the bidders see the same sheets. Either path needs a decision written down. A permit comment that changes a rated wall has to reach the bid set, or the contractor prices the wrong assembly.

Issued for construction comes later still. It is the bid set plus the addenda issued during bidding, assembled so the field is not flipping between a base set and a stack of addendum sketches. A 90% CD title block does not mean issued for construction.

Comments that belong here, and scope that does not

Fair 90% comments fix errors, coordination misses, and specification conflicts. They should be specific: sheet, detail, and the correction. "Redraw the west elevation" at 90% is a scope change wearing a review stamp. If the owner wants that change, it needs a fee and schedule conversation, not a line in the comment log.

Consultants owe the same discipline. A structural comment that revises a beam size at 90% has to hit the architectural section, the mechanical clearance, and the spec for steel. Late size changes that stay inside one discipline’s model are how the issued set contradicts itself.

Closing the set from 90 to issue

The architect or engineer of record logs each comment with a disposition, revises the sheets, and back-checks the revision clouds. Sealing happens on the issue, not on the 90% review copy. Specifications get the same back-check, because a drawing revision that changes a product without editing the spec section creates the first RFI of the job.

Teams that treat 90% as the issued set, and then slip in unreviewed edits before bidding, lose the point of the gate. The bid documents should be the reviewed set plus agreed changes, with a revision record a bidder can follow.

Examples

90% CD (90 Percent Construction Documents) on a real project

  • 01

    A 90% review finds a fire-rated corridor drawn on the plan and specified as unrated in the wall-type schedule.

  • 02

    A permit reviewer comments on stair width at 90%, and the addendum has to reach bidders before bid day.

  • 03

    A 100% issue incorporates the 90% comment log, adds professional seals, and becomes the bid set.

FAQ

Frequently asked questions

It means construction documents that are about 90 percent complete and ready for a final review. Drawings, schedules, and specifications should be coordinated. The last portion of the work is comment incorporation, sealing, and issue for bid or permit.

The 90% set is the review issue. The 100% set is the corrected, sealed issue used to bid or permit the work. If 90% comments change sheets, 100% is not a photocopy of 90%.

You can, and it is expensive. Product and detail changes at 90% ripple through coordinated sheets and specifications. Serious cost reduction belongs at 30 and 60 percent, when the set can still absorb it.

No. Issued for construction is the set the builder builds from, usually the bid documents plus addenda. A 90% CD is an earlier review copy and should not be used as the field set.
Accelerating the design and construction of the built world.

Unlock the value of your institutional knowledge—organized, connected, and grounded in your team's critical workflows with Nomic.

Start for free
What Is a 90% CD? 90 Percent Construction Documents | Nomic