AEC definitions

What Is LOD in BIM? Level of Development vs Level of Detail

Last reviewed: November 2026

LOD in BIM means level of development: how completely an element’s geometry and attached information have been resolved, and how much other team members may rely on them. It is not the same thing as level of detail, which describes how much geometry is drawn.

8" CONC. WALL W/ #5 @ 12" O.C. E.F.2" RIGID INSULATION, FULL HEIGHT5" SLAB ON GRADE OVER VAPOR RETARDER24" x 12" CONT. FOOTING W/ (3) #5 CONT.FINISH GRADE1AFOUNDATION WALL SECTIONSCALE: 3/4" = 1'-0"1234CONSULTING ENGINEERSREVISIONSPROJECTHARBOR POINT OFFICESSCALE3/4" = 1'-0"DATE03/03/2026KEY PLANSHEET TITLEFOUNDATION WALLSECTIONSHEET NUMBERS-501

What you're looking at

Foundation Wall Section, annotated

A wall section detail with the footing, reinforcing, insulation, and slab, each called out by a leader note.

  1. 1Footing with reinforcing bars
  2. 2Continuous rigid insulation
  3. 3Slab on grade bearing on the wall
  4. 4Leader notes calling out each material
Stands for
Level of development
Not the same as
Level of detail, which describes graphic complexity
Common scale
100, 200, 300, 350, 400, and 500
Reference
BIMForum Level of Development specification and AIA contract documents
ISO 19650 term
Level of information need
Set in
The BIM execution plan, by element and phase
Governs
What other people may rely on, not just what was drawn

Definition

LOD (Level of Development)

The BIMForum Level of Development specification, built on AIA work, defines standard LODs so a model author and a model user can share one expectation. LOD 100 is conceptual. LOD 200 is approximate geometry. LOD 300 is specific geometry you can measure. LOD 350 adds interfaces with other systems. LOD 400 is suitable for fabrication. LOD 500 is a field-verified representation. An element can be graphically busy and still be LOD 200 if the team has not agreed you may rely on its size and location. People also say BIM levels, BIM LOD, or LOD BIM for the same idea. The BIM execution plan should state the LOD by element and by milestone, because a single LOD for the whole model is too crude to enforce.

In depth

LOD 100 to 500: what each level allows someone to do

At LOD 100 an element may be a symbol or a mass. You can use it for early studies, not for measurement. At LOD 200 the element has approximate size, shape, location, and orientation. You can use it to reserve space, with the understanding it will move. At LOD 300 the quantity, size, shape, location, and orientation are specific enough to coordinate and to measure from, within the uses the plan allows.

LOD 350 models the interfaces: supports, connections, and the parts needed to show how the element meets its neighbors. That is the level coordination meetings often need and design models often lack. LOD 400 adds the detail a fabricator needs to make the piece. LOD 500 records a field-verified element. It is not automatic at the end of the job. Someone has to verify it.

Level of detail and level of development are different questions

Level of detail describes how much geometry is shown. Level of development describes how much thought and authorization sit behind it. A manufacturer’s highly detailed family dropped into a schematic model does not become LOD 400 because the mesh is dense. If the engineer has not designed that connection, nobody should fabricate from it.

The practical test is a sentence: may the coordinator dimension from this, may the estimator count it, may the detailer build it? Those can be three different answers for the same element. Write the authorized uses next to the LOD. The number alone gets misread.

Where ISO 19650 says level of information need

ISO 19650 does not use level of development. It uses level of information need, which states what geometric information, alphanumeric information, and documentation a deliverable must contain for a given purpose and milestone. The shift moves the question from a number on the element to a requirement the appointing party sets for each exchange.

In practice, projects in ISO 19650 markets and projects in AIA and BIMForum markets talk past each other. A US contractor asking for LOD 350 and a UK appointing party issuing a level of information need are asking for the same kind of thing in different words. Translate between them in the BIM execution plan rather than assume the terms match.

LOD is a milestone promise, not a file property

A BIM execution plan attaches target LODs to phases. Structural framing might be LOD 300 at CD issue and still LOD 200 in early DD. MEP mains might reach LOD 350 only in the trade coordination model, after award. Expecting fabrication reliability from a design model because the software can display it is how owners think they bought shop drawings in the design fee.

Different elements in one model sit at different LODs at the same time. Equipment may be a specific product while the duct connecting it is still approximate. Reports that say the model is LOD 300 without an element matrix are marketing. Ask for the matrix.

Handoffs fail at the LOD boundary

Clash detection on LOD 200 ductwork produces clashes that move when the duct is sized. That can still be useful if the meeting treats them as space reservations. Treating them as field issues wastes the trades. The coordination plan should say which LOD is in the federated model this month.

When a contractor takes over a design model for VDC, the first task is to learn what the author authorized. IFC export does not raise the LOD. It only carries what was in the source, sometimes with parameters renamed or dropped. Verify the fields you intend to rely on after the exchange.

Checking whether a delivered model meets its LOD

A LOD matrix is only useful if someone checks the delivered model against it. The check has two halves. One is geometric: whether the element is where, and as big as, the LOD allows someone to rely on. The other is data: whether the properties the matrix requires, such as fire ratings, classification codes, and manufacturer fields, are populated.

The data half can be done without opening the authoring tool. An IFC export can be opened in a browser viewer, its property sets queried, and the results compared with the drawings and specifications that say what the element should be. The geometric half usually stays in a model-checking tool with a rule set.

Examples

LOD (Level of Development) on a real project

  • 01

    A BIM execution plan requires structural steel at LOD 300 for the CD issue and leaves connections to the detailer’s LOD 400 model.

  • 02

    A generic air handler at LOD 200 is used to reserve a mechanical room, not to submit a product.

  • 03

    A coordination clash on LOD 350 piping includes the hanger zone, so the fix survives into shop drawings.

  • 04

    An appointing party issues a level of information need for the as-built handover that asks for specific property sets on every door and fire damper.

FAQ

Frequently asked questions

LOD stands for level of development. It describes how resolved an element’s geometry and information are, and how much the rest of the team may rely on them.

LOD 300 means the element’s size, shape, location, and orientation are specific enough to coordinate and measure. LOD 350 also models the interfaces with other building systems, such as supports and connections needed to show how the element is attached.

No. Level of detail is about graphic complexity. Level of development is about reliability and authorized use. A visually detailed object can still be a low level of development if the team may not rely on it for coordination or fabrication.

LOD 400 means the element includes detail suitable for fabrication, including the information a trade needs to manufacture and install that component. It is typically a detailer’s model, not the automatic contents of a design model.

ISO 19650 uses level of information need, which sets out the geometric information, alphanumeric information, and documentation a deliverable must contain for a stated purpose. It is a requirement set by the appointing party rather than a number on each element.
BIM LOD Explained: LOD 100 to 500 and Level of Detail | Nomic