What the GC is on the hook for
The GC has to deliver the scope in the drawings and specifications, on the contract time, for the contract sum, using means and methods the GC chooses. That includes site logistics, temporary power and protection, coordination among trades, and quality control of the work in place. RFIs and submittals go out under the GC’s name even when a subcontractor wrote them. The owner and architect are entitled to one coordinated contractor, not a stack of trade letters.
Safety of the construction means is the GC’s duty. The architect’s site visit is not a safety inspection. Owners who direct means and methods, or who hire trades around the GC, blur the responsibility the prime contract was written to create.