What Are AIA Contracts?

Last reviewed: November 2026

AIA contracts are standard-form agreements and administration forms published by the American Institute of Architects for design and construction projects. They are sold as numbered documents, such as A101 for the owner-contractor agreement and A201 for the general conditions, that are meant to be used together.

1234567ABCOFFICE401OFFICE402OFFICE403OFFICE404OFFICE405OFFICE406OFFICE407OFFICE408OFFICE409OPEN OFFICE410OPEN OFFICE411CONFERENCE412CONFERENCE413STAIRS2401402403404405406P127'-3"27'-0"27'-3"27'-3"27'-0"27'-3"94'-8"1AFLOOR PLANSCALE: 1/8" = 1'-0"N1234CONSULTING ENGINEERSREVISIONSPROJECTHARBOR POINT OFFICESSCALE1/8" = 1'-0"DATE07/01/2026KEY PLANSHEET TITLEFLOOR PLANSHEET NUMBERA-101

What you're looking at

Floor Plan, annotated

An architectural floor plan with walls, doors, room tags, and the column grid every other discipline draws on.

  1. 1Exterior wall with window openings
  2. 2Door, swing, and door tag
  3. 3Room name and number
  4. 4Partition type tag
Publisher
The American Institute of Architects
Organized by
Series letter for purpose and document family for project type
A series
Owner-contractor agreements, general conditions, bonds, and bidding
B series
Owner-architect agreements
G series
Contract administration forms such as change orders and pay applications
Edition year
Shown after the number, as in A201-2017

Definition

AIA contract documents

AIA Contract Documents are a library of standard forms that cover the legal and administrative relationships on a building project: owner and contractor, owner and architect, architect and consultants, and the paperwork that moves a project from change orders to payment to substantial completion. Each document has a letter and number, such as A201, and an edition year, such as 2017. The letter names the purpose of the document. The document also belongs to a family of coordinated documents that share terminology, so an agreement can adopt the general conditions by reference instead of repeating them. Parties modify the standard text with supplementary conditions and amendments, which is why two projects on the same AIA forms can carry different obligations.

In depth

How the series are organized

The letter identifies what the document does. The A series covers owner-contractor agreements and related documents such as the general conditions and bonds. The B series covers owner-architect agreements. The C series covers other agreements, including architect-consultant arrangements. The D series is miscellaneous. The E series holds exhibits, including digital practice exhibits. The F series covers facility maintenance documents. The G series holds contract administration and project management forms.

AIA also groups documents into families by project type, such as the stipulated sum, cost-plus, construction manager as constructor, and design-build families. Documents in the same family use common terms and adopt each other by reference, so mixing forms from different families without checking the cross-references can leave a defined term pointing at the wrong document.

A201 is the center of most owner-contractor projects

The A201 General Conditions of the Contract for Construction sets out how the project runs after the agreement is signed: the roles of owner, contractor, and architect, how changes are priced, how claims and disputes are handled, how payment and substantial completion work, and what insurance and bonds are expected. The agreement forms, such as A101 for a stipulated sum, state the price and time and incorporate A201 by reference.

That structure matters when reading a contract. A clause that looks missing from the agreement is often in A201, and a clause that looks standard may have been changed in the supplementary conditions. Reviewing only the agreement or only the base A201 text misses the actual deal.

The G-series forms people use every month

G701 is the change order, signed by owner, contractor, and architect when the work, price, or time changes. G702 is the application and certificate for payment, and G703 is the continuation sheet that lists each line of the schedule of values. G704 records the date of substantial completion, and the list of items still to be finished accompanies it.

Contractor-subcontractor variations carry an S suffix, such as G702S, so the same forms can be used one tier down. These forms are repetitive, and they are where a signed contract number turns into a month-by-month payment record.

Standard forms are starting points

Most projects modify the AIA text. Owners and their attorneys add supplementary conditions that change notice periods, insurance limits, indemnity language, or the claims procedure. AIA’s document software can show changes from the standard text, but a PDF in a project folder does not always show what was changed.

A reader comparing contracts across projects has to read the amendments and supplementary conditions together with the base form. The edition year matters as well, because an A201-2007 and an A201-2017 differ in their provisions.

AIA is not the only standard-form publisher

ConsensusDocs, published by a coalition of industry associations, and the Engineers Joint Contract Documents Committee, known as EJCDC, publish competing standard forms. Public owners often use their own agreements. Federal projects use the Federal Acquisition Regulation clauses instead of A201.

A project team therefore needs to know which family governs before applying any assumption about notice periods, payment timing, or change order procedure.

Examples

AIA contract documents on a real project

  • 01

    An owner and contractor sign an A101 stipulated sum agreement that incorporates A201-2017 as the general conditions.

  • 02

    A contractor submits a G702 application for payment with a G703 continuation sheet that breaks the contract sum into lines of the schedule of values.

  • 03

    An owner’s attorney adds supplementary conditions that shorten the claim notice period in A201 from the default.

FAQ

Frequently asked questions

AIA contracts are standard-form agreements and administration forms published by the American Institute of Architects, such as the A101 owner-contractor agreement, the A201 general conditions, and the B101 owner-architect agreement.

The letter shows the document series: A for owner-contractor agreements and related documents, B for owner-architect agreements, C for other agreements, D for miscellaneous documents, E for exhibits, F for facility maintenance documents, and G for contract administration forms.

A201 is the General Conditions of the Contract for Construction. It sets out the roles of the owner, contractor, and architect and how changes, claims, payment, and completion work. Agreements such as A101 incorporate it by reference.

G702 is the Application and Certificate for Payment, and G703 is the Continuation Sheet that lists each line of the schedule of values. Together they are the standard monthly pay application on many projects.

Yes. Parties commonly change the standard text through supplementary conditions or amendments, so the signed contract can differ from the base AIA form.