AI drafting for shop drawings

AI Shop Drawing Drafting for Subcontractors and Fabricators

A shop drawing turns the design intent into the sizes, connections, and materials a fabricator can build from, and every one has to match the drawings, the schedule, and the product the contract allows. Nomic drafts the shop drawings from the design set, the schedules, and your product data, keeps every item numbered the way the design team numbered it, and lists what the drawings do not say so your team can ask before it fabricates.

Last reviewed: November 2026

You send

  • Design drawings and the relevant schedules as PDF or DWG
  • The specification sections for the work
  • Your product data, cut sheets, and standard details
  • One shop drawing in the format your company uses

Nomic hands back

  • Shop drawings as DWG files and a combined PDF for submittal
  • A cover sheet and item list in schedule order
  • A coverage list of items missing, renumbered, or dimensioned differently
  • Draft RFIs for the questions the design documents leave open
TALL STORAGE2'-10" MAX AFFT-1PL-2P-1CEILING 9'-0" AFF1AINTERIOR ELEVATIONSCALE: 1/2" = 1'-0"1234CONSULTING ENGINEERSREVISIONS1ISSUED FOR REVIEWPROJECTWESTFIELD LABSSCALE1/2" = 1'-0"DATE03/17/2026KEY PLANSHEET TITLEINTERIORELEVATIONSHEET NUMBERA-401

On the sheet

Interior Elevation, annotated

An interior elevation with casework, mounting heights, and finish tags keyed to the finish legend.

  1. 1Base cabinets with drawers and doors
  2. 2Countertop height dimension
  3. 3Upper cabinets and tall storage
  4. 4Finish tags keyed to the finish legend

The problem

Each item is redrawn from the design set, one at a time

Subcontractors and fabricators redraw what the architect and engineer already drew, at the scale and with the dimensions a shop needs. A door supplier draws every opening from the door schedule with its frame profile, hardware preps, and rating label. A steel fabricator draws each connection from the structural details. A millwork shop draws each cabinet run from the interior elevations. The template is usually the first sheet someone made for the job, copied for every item after it.

The work is careful copying, and copying is where it goes wrong. An opening on the plans has no shop drawing, a frame depth does not match the wall type, an item is numbered differently from the schedule, or a dimension was taken from a sheet that has since been revised. Those come back as review comments, and every round of resubmittal pushes back the order date.

01 / Draft

Drafted from the design set and your first sheet

Attach the design drawings, the schedule, your product data, and one shop drawing in the format your company already uses. Nomic draws every item in that format: elevations, sections, and connection details with the dimensions, materials, and finishes the design and the product data call for, and a cover sheet with the item list.

  • One sheet per item, in your title block and drawing format
  • Item numbers taken from the schedule, in schedule order
  • Dimensions from the design drawings and your product data
02 / Match

Every item checked against the schedule and the plans

Nomic compares the shop drawings with the design documents item by item. Each scheduled item has a sheet, each sheet points back to a schedule row, and every dimension that differs from the design drawings is listed with both values so your project manager decides which one governs.

  • Scheduled items with no shop drawing listed
  • Numbering differences between the schedule and the plans flagged
  • Dimensions that disagree with the design drawings listed with both values
03 / Submit

Questions listed before the submittal goes out

Anything the design documents leave open is listed, not guessed: a missing dimension, a conflict between the specification and the drawings, or a product the specification does not name. Your team sends those as RFIs or notes on the submittal, and the reviewer sees a set that already matches the design.

  • Open questions written as draft RFIs with the sheet cited
  • Specification section and product data cited on each sheet
  • Changes from the last submittal clouded on resubmittals

Checked against

The code and documents behind every sheet

Name the editions the project is designed to and Nomic checks its own drawing against them before handing it back. Your engineer or architect of record makes the final call and stamps the set.

  • AIA A201 Section 3.12 shop drawings, product data, and samples
  • Section 01 33 00 submittal procedures in the project specification
  • AISC 303 Code of Standard Practice for structural steel
  • Architectural Woodwork Standards for millwork
  • The approved product data and the contract drawings

How it works

From a sentence to a stamped set

  1. Step 1

    Ask for the drawing

    Say what the sheet needs to show and attach the backgrounds, markups, cutsheets, or photos. A sentence is enough to start.

  2. Step 2

    Nomic drafts it in CAD

    Nomic works in CAD on its own computer and saves real DWG files to the project, or in your open AutoCAD drawing or Revit model through its add-ins. Either way it uses your layers and blocks and follows how your firm drew the same thing before.

  3. Step 3

    Nomic checks its own work

    The drawing is checked against the code editions you name and the source documents. Everything Nomic drew is clouded, and open questions are listed.

  4. Step 4

    Your team reviews and stamps

    Your engineers and architects review the clouded changes, make the final call, and issue the set under their own stamp.

FAQ

Frequently asked questions

Yes. Nomic works in CAD on its own computer and drafts shop drawings from the design drawings, the schedules, and your product data. Each item comes back as a dimensioned DWG sheet in your format, with a combined PDF for the submittal.

Doors and frames, millwork and casework, miscellaneous metals, steel connections, railings and fences, storefront, and the other trades that redraw the design set into fabrication drawings. The input is the same in each case: the design drawings, the specification, your product data, and one example sheet.

No. Nomic drafts the shop drawings for the subcontractor or fabricator to submit. The design team reviews and stamps the submittal, and where the specification calls for delegated design, the engineer responsible for that design signs it.

Nomic numbers every sheet from the schedule, then checks the set item by item. Scheduled items with no sheet, sheets with no schedule row, and dimensions that disagree with the design drawings are listed with the sheet each value came from.

Both. With the Nomic add-ins for AutoCAD and Revit, the Nomic agent works in the drawing or model your team has open, with your approval before each change. Nomic can also draft on its own computer and save DWG files that open in AutoCAD or any DWG editor.
AI Shop Drawings: Drafted from the Design Set | Nomic