Zoning first, code second
You can design a code-compliant building the zoning map does not allow. Entitlements belong before construction documents are finished, or the CD set will be redrawn.
Conditions of approval, such as a required public path or a limited use, should be printed on the site plan so they are not lost after the hearing.