The statement is a permit document
It lists the inspections, the frequency, and the wind or seismic category that triggered them. The structural notes and the statement should match. A boilerplate list that includes tests the project does not need, or omits ones it does, will be corrected in plan check or in the field.
The contractor's schedule should include hold points for continuous inspections.



