Quality assurance versus quality control
The two halves get conflated constantly, and the conflation is expensive. Quality assurance is what you build before the work starts: the quality plan, the procedures, the standards, the review workflows, the training. Quality control is what you do to the work after it exists: inspect it, test it, measure it against the requirement.
A project with strong QC and weak QA finds a lot of defects. A project with strong QA finds fewer, because fewer were created. Both are necessary, but they are not interchangeable, and a quality program that is all inspection is a program that has decided to pay for rework.



