AEC definitions

What Is a Revision Cloud?

Last reviewed: September 2026

A revision cloud is a scalloped line drawn around the part of a sheet that changed, with a revision number or letter that matches the title block. It tells the reader what is different from the previous issue, and it leaves the rest of the sheet alone.

Looks like
A series of arcs circling the change
Tagged with
A revision number or letter, often in a triangle
Matches
The revision history in the title block
Used on
Addenda, ASIs, bulletins, and reissued sheets
Removed
On the next full issue, once that delta is the baseline
Does not replace
A written description of what changed

Definition

Revision cloud

Clouds are a communication device, not a change to the work by themselves. The revised geometry, note, or schedule cell is the change. The cloud and the revision triangle point at it. Addenda, ASIs, and bulletins use the same graphic so a bidder or a superintendent can see the delta without reading the whole sheet. A cloud with no matching line in the title block, or a title-block revision with no clouds, is an incomplete issue.

In depth

Read the cloud with the revision list

Find the revision number in the triangle. Find the same number in the title block and read the description: 'addendum 2, door 104 widened.' Then look inside the cloud. If the description and the geometry tell different stories, ask before you build the more convenient one.

Old clouds from prior revisions are usually removed when a new revision is issued, so only the latest delta is clouded. If a sheet still shows clouds from revision 2 and revision 3, confirm whether that was intentional. Most standards keep only the current clouds.

Cloud what changed, not the whole plan

A cloud around an entire floor plan says nothing. Cloud the door, the dimension, the note, or the schedule cells that changed. If many cells changed, cloud the schedule and say so in the description.

A change that touches two sheets needs a cloud on both, plus the index if a sheet was added. Clouding the plan and not the schedule repeats the orphan-tag problem.

The cloud is not the contract instrument

An addendum, an ASI, or a change order is the instrument. The cloud is how the drawing shows the instrument's effect. A cloud emailed as a sketch, with no instrument and no revision, is not an issue of the contract documents.

Say the instrument in the revision description. 'Revised per RFI 42' is a description. 'Misc changes' is not.

Digital clouds have the same job

PDF markups and model revision clouds should plot onto the issued sheet. A cloud that exists only in a review session, and not on the PDF the field downloaded, was never issued.

Compare tools can highlight geometric deltas the cloud missed. That is a useful check before you send the addendum. It does not replace the cloud the reader was promised.

The field uses clouds to limit rework

A superintendent looks at the clouds to see what to rebuild in the set in the trailer. If the real change is outside the cloud, they will miss it. If the cloud covers half the sheet for a one-word note, they will stop trusting clouds.

Record the revision in the set the trailer holds. A current PDF on a server, and a plotted set two revisions back, is how the wrong door gets framed.

Examples

Revision cloud on a real project

  • 01

    Revision 4 clouds a dimension on A-101 and a cell in the door schedule. The title block says 'addendum 3, door 104 width.' Both sheets carry revision 4.

  • 02

    An ASI sketch clouds a detail and the revision description cites the ASI number. The change order is not required because the ASI states no cost and no time.

  • 03

    A sheet is reissued for construction with prior bid-cloud marks removed. Only the clouds since the last construction issue remain.

FAQ

Frequently asked questions

It is a scalloped mark around the portion of a drawing that changed in the current revision, numbered to match the title block. It shows the delta. The revised content is the actual change.

It holds the revision number or letter. The same identifier appears in the title block with the date and a description.

Standard practice removes clouds from earlier revisions when you issue the next one, so readers see only the latest change. The history remains in the title block.

No. The addendum, ASI, bulletin, or change order authorizes the change. The cloud shows it on the sheet. A cloud without that instrument is not an issued revision.
Accelerating the design and construction of the built world.

Unlock the value of your institutional knowledge—organized, connected, and grounded in your team's critical workflows with Nomic.

Start for free
What Is a Revision Cloud? | Nomic