Unmarked catalogs waste the review
The submittal should identify the spec section, the product name, the model, and the options. Highlighters or stamps that say 'proposed' are the usual method. Pages that do not apply should be omitted or crossed out.
A reviewer who receives the entire catalog is entitled, under many Division 01 sections, to return it without review. The contractor's job includes selecting.



