What Is an Invert Elevation?

Last reviewed: November 2026

An invert elevation is the elevation of the lowest point on the inside of a pipe, culvert, or channel. Civil plans give inverts at the ends of each pipe and at each structure, and the difference between two inverts over the pipe length sets the slope that makes water flow.

TALL STORAGE2'-10" MAX AFFT-1PL-2P-1CEILING 9'-0" AFF1AINTERIOR ELEVATIONSCALE: 1/2" = 1'-0"1234CONSULTING ENGINEERSREVISIONSPROJECTNORTHGATE MEDICALSCALE1/2" = 1'-0"DATE05/16/2026KEY PLANSHEET TITLEINTERIORELEVATIONSHEET NUMBERA-401

What you're looking at

Interior Elevation, annotated

An interior elevation with casework, mounting heights, and finish tags keyed to the finish legend.

  1. 1Base cabinets with drawers and doors
  2. 2Countertop height dimension
  3. 3Upper cabinets and tall storage
  4. 4Finish tags keyed to the finish legend
Measures
The elevation of the inside bottom of a pipe or channel
Reference
The project vertical datum, such as NAVD 88
Used for
Setting slope, depth, and connections in gravity pipes
Compare with
Rim elevation, the top of a structure, and crown, the inside top of a pipe
Shown on
Utility plans, profiles, and structure tables
Slope
Invert difference divided by the pipe length

Definition

Invert elevation

The invert is the inside bottom of a pipe, where water runs when the pipe is flowing low. Its elevation is measured against the project’s vertical datum, so a designer can compare it with the ground surface, the top of a manhole, and other utilities. Gravity sewer and storm drains depend on it because they work only if each segment slopes downhill. Civil drawings list invert elevations in plan views, profiles, and structure tables, usually as an invert in for each incoming pipe and an invert out for the outgoing pipe at a manhole, catch basin, or inlet. The invert is not the same as the outside bottom of the pipe, which sits lower by the thickness of the pipe wall, and the difference leads to field errors.

In depth

Invert, crown, rim, and depth

The invert is the inside bottom of the pipe. The crown, sometimes called the obvert, is the inside top. The rim is the top of a manhole or inlet structure, and the depth of the structure is the rim elevation minus the lowest invert. Flow line is a common regional term for the invert.

These terms carry numbers that have to agree. A manhole with a rim at 105.0 and an invert out at 98.5 is 6.5 feet deep, and the crew digs to that depth plus the base and the pipe bedding.

How inverts set the slope

Gravity pipes only work when each segment drops. Slope is the difference between the upstream and downstream inverts divided by the pipe length. A pipe with an invert of 100.00 at one end and 99.50 at the other, 100 feet apart, has a slope of 0.5 percent.

Local standards set minimum and maximum slopes for each pipe size and use, so a plan reviewer checks the invert numbers against the agency’s requirements. A segment that drops too little can collect sediment, and one that drops too much can run too fast for the pipe or structure.

Inverts at manholes and inlets

At a structure, the drawings give an invert for each connecting pipe. A pipe entering at a higher invert than the pipe leaving makes a drop, and a large drop needs special detailing. When pipe size changes, designers commonly match the crowns of the two pipes, and local standards state which convention applies.

Because each pipe’s invert at one structure is the end of one segment and the start of another, the invert out at one manhole and the invert in at the next have to differ by the slope times the length. A mismatch between the profile, the plan labels, and the structure table is a common plan check comment.

Existing inverts and conflicts

A new storm or sanitary line often connects to an existing system, and the existing invert has to be verified in the field before the design is final. Surveyed inverts that differ from the record drawings change the slope of the new line and sometimes whether it can connect by gravity at all.

Utilities also cross. A new gravity pipe with a fixed invert cannot be moved up or down to avoid a water main without changing its slope, so crossings are checked using the pipe’s outside dimensions, not just the invert.

Where invert errors come from

Common errors are an invert read as the pipe centerline or the outside bottom, a datum mismatch between the survey and the design, a profile that was not updated after a plan revision, and a structure table that carries the earlier numbers.

Because the same number appears in plan, profile, table, and sometimes the grading plan, one revision can leave the set inconsistent.

Examples

Invert elevation on a real project

  • 01

    A manhole table lists an invert in of 98.75 from the north and an invert out of 98.50 to the south.

  • 02

    A profile shows a 12-inch storm pipe dropping 1.2 feet over 240 feet, a slope of 0.5 percent.

  • 03

    A surveyor finds the existing sewer invert six inches higher than the record drawing, and the new service line slope is revised.

FAQ

Frequently asked questions

An invert elevation is the elevation of the inside bottom of a pipe, culvert, or channel, measured against the project’s vertical datum.

The invert is the inside bottom of the pipe, and the rim is the top of the manhole or inlet structure. The structure depth is the rim elevation minus the lowest invert.

Subtract the downstream invert from the upstream invert and divide by the pipe length. The result is the slope, often given as a percent.

At a manhole or inlet, invert in is the invert of a pipe flowing into the structure, and invert out is the invert of the pipe flowing out.

The invert is the inside bottom of a pipe and the crown, also called the obvert, is the inside top. The difference between them is the inside diameter for a round pipe.