What Is an Equipment Schedule?

Last reviewed: September 2026

An equipment schedule is a table on the drawings that lists pieces of equipment, keyed by a mark, with the capacity, size, and electrical data the design requires. The plans show where the mark sits. The specification states quality. The submittal has to satisfy both the schedule and the spec.

EQUIPMENT SCHEDULEMARKSERVESCFMESPHPVOLTSPHWEIGHTREMARKSAHU-1LEVEL 182002.0"1548033350 LBSEISMIC CURBAHU-2LEVEL 283002.0"1548033000 LBVFD, MERV 13AHU-3LEVEL 391002.0"1548033200 LBAHU-4LEVEL 486002.0"1548032600 LBFCU-1RM 30410000.5"1/22081160 LBFCU-2RM 3056000.5"1/22081120 LBFCU-3RM 3065000.5"1/22081160 LBVFD, MERV 13FCU-4RM 30711000.5"1/22081130 LBFCU-5RM 3087000.5"1/22081130 LBFCU-6RM 30911000.5"1/22081210 LBEF-1RM 3108000.5"1/22081130 LBEF-2RM 3118000.5"1/22081190 LBVFD, MERV 13EF-3RM 3124000.5"1/22081120 LBSEISMIC CURBEF-4RM 31311000.5"1/22081140 LBEF-5RM 3148000.5"1/22081160 LBEF-6RM 31511000.5"1/22081120 LB1AEQUIPMENT SCHEDULESCALE: NONE1234CONSULTING ENGINEERSREVISIONSPROJECTMAPLE RIDGE SCHOOLSCALENONEDATE07/26/2026KEY PLANSHEET TITLEEQUIPMENTSCHEDULESHEET NUMBERA-601

What you're looking at

Equipment Schedule, annotated

An equipment schedule with each unit tagged to the plans, its airflow, motor, electrical data, and weight.

  1. 1Equipment tag keyed to the plans
  2. 2Electrical data for the power plan
  3. 3Remarks with special requirements
  4. 4Revised row, clouded for the reissue
Lives on
The discipline's drawings
Keyed by
A mark that also appears on the plan
States
Capacity, configuration, and power
Paired with
The specification section for that equipment
Checked at
Submittal review and purchase
Basis of design
A representative product, not a waiver of the numbers

Definition

Equipment schedule

Mechanical, plumbing, kitchen, and electrical drawings each use schedules. A mark such as AHU-1 on the plan must be AHU-1 on the schedule, with airflow, static pressure, and power. If the schedule and the spec disagree, you have a conflict to resolve before purchase. A basis-of-design column names a representative product. It is not permission to ignore the performance numbers. Contractors price and submit from the schedule. A schedule that says 'see spec' for every value is not a schedule.

In depth

One mark, one piece, one row

Orphan marks on the plan and orphan rows on the schedule are the first coordination check. Renaming a unit in a meeting without changing both is how the wrong unit is ordered.

Quantities should be explicit when one row covers multiple identical units.

The numbers are the design

Airflow, cooling capacity, horsepower, voltage, and weight are what the structure, the electrical service, and the energy model rely on. A lighter submittal that misses capacity is not a saving.

Electrical data on a mechanical schedule must match the panel schedule's circuit. Three different horsepower numbers is a coordination miss.

Performance in both places has to match

If the schedule says 10,000 cfm and the spec says 8,000, the submittal will pick one. Edit them together. Put options and acceptable manufacturers where your office standard says, and do not contradict them on the other sheet.

Accessories, such as disconnects and vibration isolation, should be columns or spec sentences, not assumptions.

Review against the row

The cut sheet is marked to the scheduled configuration. Deviations are listed.

Approved-as-noted must say which number changed, because a changed electrical load revises the panel schedule too.

Examples

Equipment schedule on a real project

  • 01

    AHU-1 on the plan matches a schedule row with airflow, static pressure, and a 460 volt motor. The panel schedule feeds that motor.

  • 02

    The basis-of-design manufacturer is named. The submittal uses an allowed alternate that meets every scheduled number.

  • 03

    A kitchen schedule's gas load is coordinated with the plumbing riser.

FAQ

Frequently asked questions

A table on the drawings listing each piece of equipment, its mark, and the performance and electrical data required. Plan tags point to the rows.

The schedule states the project's numerical requirements and marks. The specification states quality, standards, and execution. Submittals must meet both.

A representative product that shows the level of performance. Substitutes still have to meet the scheduled capacities and the specification.

The set is uncoordinated. Add the row or delete the mark before bid or purchase. Do not let the vendor choose.