Revit clash fixes with AI

Fix Clashes in Revit with AI: Find, Resolve, and List What Is Left

A clash report tells you where two things collide. It does not move the duct. With the Nomic add-in, you ask for the clashes between systems on a level, with the clearance you need, and Nomic finds them in the open model, including against linked models, fixes the ones it can with your approval, and lists the rest for whoever owns that discipline.

Last reviewed: November 2026

You send

  • The Revit model open with the Nomic add-in connected
  • The systems and level to check, and the clearance you need
  • Linked models to check against
  • Which fixes Nomic may make and which it should only list

Nomic hands back

  • A grouped list of clashes with locations and elements
  • Fixes made in the model after your approval
  • A list of remaining clashes by the discipline that owns them
  • An image check of the views that changed
1234567ABCCLASSROOM201CLASSROOM202CLASSROOM203CLASSROOM204CLASSROOM205CLASSROOM206CLASSROOM207CLASSROOM208CLASSROOM209CLASSROOM210CLASSROOM211MEDIA CENTER212MEDIA CENTER213STAIRS224x14AHU-127'-3"27'-0"27'-3"27'-3"27'-0"27'-3"94'-8"1AHVAC PLANSCALE: 1/8" = 1'-0"N1234CONSULTING ENGINEERSREVISIONS1ISSUED FOR REVIEWPROJECTMAPLE RIDGE SCHOOLSCALE1/8" = 1'-0"DATE04/24/2026KEY PLANSHEET TITLEHVAC PLANSHEET NUMBERM-101

On the sheet

HVAC Plan, annotated

A mechanical plan with supply and return ductwork, diffusers, and the equipment that serves each zone.

  1. 1Main supply duct, sized width by depth
  2. 2VAV box feeding the zone
  3. 3Supply diffuser at the end of the branch
  4. 4Return grille

The problem

Finding a clash is minutes, and fixing it is days

Coordination software is good at the finding. A run produces a list of a few hundred clashes, and each one still needs a person to open the model, look at the neighbors, decide which element moves, and make the change without creating a new clash next to it. That is where the days go.

Most clashes are not hard. A duct drops two inches to clear a beam, a branch moves a foot to the other side of a column. They wait in the queue anyway, because the person who can fix them is busy with the ones that are hard.

01 / Find

Clashes found with the clearance you set

Ask in plain language, for example where ductwork clashes with structural framing on Level 2 with one inch of clearance. Nomic runs the check in the open model, including against linked models, and groups what it finds by the elements involved.

  • Checks against linked models as well as the open one
  • Clearance set in the request, not fixed in a rule
  • Clashes grouped by the elements and level involved
02 / Fix

The simple ones fixed in the model, with approval

Nomic asks before each change, and for larger edits it first runs the change, reports what it does to the neighbors, and rolls it back. You approve, and Nomic makes the change using your families and types. Connections and sizing are checked afterward, because a fix that opens a new problem is not a fix.

  • Larger fixes previewed and rolled back before approval
  • Changes made with your families, types, and systems
  • Connections and sizing checked after the change
03 / Hand off

What is left is listed for the person who owns it

A clash that moves a structural member, or that needs a routing decision, belongs to the engineer who owns it. Nomic lists it with its location, the elements involved, and the discipline that owns the decision, so the coordination meeting starts with the short list.

  • Remaining clashes listed with location and elements
  • The discipline that owns each decision named
  • The engineer or architect of record makes the final call

Checked against

The code and documents behind every sheet

Name the editions the project is designed to and Nomic checks its own drawing against them before handing it back. Your engineer or architect of record makes the final call and stamps the set.

  • The open model and linked models
  • Clearances you set in the request
  • MEP connections and sizing after each fix
  • An image of the affected view after each change

How it works

From a sentence to a stamped set

  1. Step 1

    Ask for the drawing

    Say what the sheet needs to show and attach the backgrounds, markups, cutsheets, or photos. A sentence is enough to start.

  2. Step 2

    Nomic drafts it in CAD

    Nomic works in CAD on its own computer and saves real DWG files to the project, or in your open AutoCAD drawing or Revit model through its add-ins. Either way it uses your layers and blocks and follows how your firm drew the same thing before.

  3. Step 3

    Nomic checks its own work

    The drawing is checked against the code editions you name and the source documents. Everything Nomic drew is clouded, and open questions are listed.

  4. Step 4

    Your team reviews and stamps

    Your engineers and architects review the clouded changes, make the final call, and issue the set under their own stamp.

FAQ

Frequently asked questions

With the Nomic add-in for Revit, Nomic finds clashes in the open model, including against linked models, fixes the ones it can with your approval, and lists the rest for the discipline that owns them.

No. Nomic lists clashes that need a structural decision, with their locations, for the structural engineer. The engineer or architect of record makes the final call.

It asks before each change, previews larger edits by running the change, reporting the effect, and rolling it back, and checks MEP connections and sizing after the change. Each approved change is one Revit transaction you can undo.

A clash detection tool reports where elements collide. Nomic works in the Revit model to resolve the simple clashes and list the rest. For IFC models without Revit, Nomic also surfaces clash candidates from model data in the browser.

The Revit add-in is part of the Enterprise plan and is in enterprise preview. Your Nomic account team provides the installer and turns it on for your organization.