The geotechnical report sets the rules
The geotechnical engineer recommends the foundation type and gives an allowable bearing pressure, such as 3,000 pounds per square foot for spread footings on engineered fill, along with minimum embedment, subgrade preparation, and slab support requirements. The structural engineer sizes footings to those values, and the structural general notes repeat them so the field can verify bearing before the pour.
When the report calls for deep foundations, the plan shows pile caps with driven piles or drilled piers and their capacities, and the pile layout becomes a coordination item with site utilities. IBC Section 1803 sets when a geotechnical investigation is required and what it has to report.