A foundation plan is a structural drawing that shows the footings, foundation walls, grade beams, piers or piles, and slab on grade for a building, with sizes, elevations, and reinforcing references. It is based on the geotechnical report and locates every element from the column grid.

1234567ABCF2F2F2F2F25" SLAB ON GRADEW/ 6x6-W2.9 WWF OVER 15 MIL VBTOP OF FOOTING EL. 96'-0" U.N.O. | ALLOWABLE BEARING 3,000 PSF27'-3"27'-0"27'-3"27'-3"27'-0"27'-3"94'-8"1AFOUNDATION PLANSCALE: 1/8" = 1'-0"N1234CONSULTING ENGINEERSREVISIONSPROJECTRIVERSIDE HOTELSCALE1/8" = 1'-0"DATE06/02/2026KEY PLANSHEET TITLEFOUNDATION PLANSHEET NUMBERS-101

What you're looking at

Foundation Plan, annotated

A foundation plan with spread footings at each column, continuous wall footings, and the slab on grade.

  1. 1Spread footing under each column
  2. 2Footing tag keyed to the schedule
  3. 3Continuous wall footing at the perimeter
  4. 4Slab on grade note
Sheet
Usually S-101, the first structural plan
Shows
Footings, foundation walls, grade beams, piers, piles, slab on grade
Based on
The geotechnical report's bearing values and recommendations
Governing code
IBC Chapter 18 and ACI 318
Marks point to
Footing and pier schedules and foundation details
Coordinated with
Underslab plumbing and conduit, elevator pits, and site utilities

Definition

Foundation plan

The foundation plan is usually the first plan in the structural set, typically S-101, and it shows the part of the building that is hardest to change once concrete is placed. Spread footings are tagged with marks such as F1 or F2 that point to a footing schedule, continuous footings run under bearing and foundation walls, and the slab on grade note gives thickness, reinforcing, vapor retarder, and joint layout. Top of footing elevations, step footings, and the frost depth set how deep everything goes.

In depth

The geotechnical report sets the rules

The geotechnical engineer recommends the foundation type and gives an allowable bearing pressure, such as 3,000 pounds per square foot for spread footings on engineered fill, along with minimum embedment, subgrade preparation, and slab support requirements. The structural engineer sizes footings to those values, and the structural general notes repeat them so the field can verify bearing before the pour.

When the report calls for deep foundations, the plan shows pile caps with driven piles or drilled piers and their capacities, and the pile layout becomes a coordination item with site utilities. IBC Section 1803 sets when a geotechnical investigation is required and what it has to report.

Depth is set by frost, soil, and grade

Footings must bear below the frost line unless they are frost-protected, under IBC Section 1809.5, and the local frost depth usually comes from the jurisdiction's amendments. Top of footing elevations are noted on the plan, and step footings are shown where the grade or floor level changes.

A footing poured 2 feet deeper than drawn because the field found unsuitable soil changes wall heights and anchor rod lengths above it. The foundation plan is where those field revisions get recorded for the record set.

Marks and schedules keep the plan readable

A footing schedule lists each mark with plan size, thickness, and reinforcing, such as F6 at 6 feet square by 18 inches thick with seven #6 bars each way. The plan shows only the mark, the location, and the top of footing elevation, so plan and schedule have to stay matched through every revision.

Column base plates and anchor rods are often scheduled separately and coordinated with the steel framing. Anchor rods are cast before the steel arrives, so an error in the anchor rod layout is discovered when a column will not land.

Slab on grade carries more coordination than it looks

The slab note gives thickness, reinforcing or fiber, the vapor retarder, and the base course. Depressions for tile, showers, and walk-in coolers, thickened slabs under partitions or equipment, and control joint spacing all appear on the foundation plan or a separate slab plan.

Underslab plumbing, electrical conduit, and floor boxes go in before the pour, and the slab is expensive to change after. Elevator pits, sump pits, and trench drains need their own depressed areas with waterproofing and reinforcing details.

Foundation walls retain soil and need their own design

Basement and retaining walls are designed for lateral soil pressure, groundwater, and surcharge from adjacent footings or traffic. The plan shows wall thickness and points to sections with reinforcing, waterproofing, and drainage.

Whether the top of a wall is braced by the floor framing changes its design, so the drawings often note that backfill cannot be placed until the floor is in place. That sequence note is one of the items on a foundation plan the contractor most needs to see.

Examples

Foundation plan on a real project

  • 01

    S-101 shows F4 spread footings under interior columns on grids B through E with top of footing 2 feet below finished floor, and notes an allowable bearing pressure of 3,000 pounds per square foot from the geotechnical report.

  • 02

    An elevator pit 5 feet deep is detailed with waterproofing and a sump, and the pit outline is checked against the elevator manufacturer's shop drawings.

  • 03

    A thickened slab is added under a 12,000 pound generator, and the slab on grade note is clouded in the bulletin.

FAQ

Frequently asked questions

A structural plan showing the footings, foundation walls, grade beams, piers or piles, and slab on grade, with sizes, elevations, and references to schedules and details.

The foundation plan shows what the building bears on at and below grade. Framing plans show the beams, joists, and columns at each floor and the roof above it.

It is a tag that points to a row in the footing schedule giving that footing's plan size, thickness, and reinforcing. The plan shows where each F3 goes.

The structural engineer of record, based on the geotechnical engineer's report. On small residential projects, a designer may draw it where the IRC prescriptive footing provisions apply.
What Is a Foundation Plan? | Nomic