The real difference is where the information lives
A CAD drawing knows a line is on layer P-DOMW-CPIP, and a person knows that layer means domestic cold water piping. A BIM model knows the element is a 3/4 inch copper domestic cold water pipe connected to a fixture on a named system. Schedules, clash detection, and quantity takeoff all depend on which of those two the file holds.
That is why BIM supports coordination and quantities in ways CAD cannot, and also why a BIM model is only as reliable as the properties someone entered. A model with every duct at a placeholder size coordinates cleanly on screen and builds badly.


