- Project Manual Vol 1.pdf1,240 pages
- M-101 HVAC Plans.pdf22 sheets
- M-401 Mechanical Room Details.pdf6 sheets
- Addendum 03.pdfAddendum
- RFI Log.xlsx64 RFIs
Draft from the spec and the sheets you name
Point Nomic at the RFI, the spec section, and the sheet range that answer it. Nomic reads those documents and writes a draft with a citation on every sentence.
- Name the RFI, the spec section, and the sheets
- Every sentence in the draft cites the source it came from
- You edit the draft before it goes back to the contractor





