New:
Active project research
AI RFI Anticipator for Preconstruction Drawing and Spec Review

Most RFIs are predictable: missing information, ambiguous notes, or conflicts between drawings and specs that nobody had time to catch before issuance. RFI Anticipator reviews your construction drawings and specifications for those gaps and produces cited findings, supporting inventories, and a summary report—so you can resolve questions before they cost time in the field.

Nomic project research interface showing AI-assisted retrieval of project information from drawings, specifications, and project documents
Find the questions that become RFIs before bid or issuance
01 / Preconstruction review

Find the questions that become RFIs before bid or issuance

RFI Anticipator reads drawings and specs the way a sharp PE or superintendent would—looking for missing details, conflicting notes, unclear scopes, and coordination gaps that typically trigger RFIs during construction.

  • Surface missing, ambiguous, and conflicting information across drawings and specs
  • Produce cited findings tied to exact sheets and specification sections
  • Generate supporting inventories and a summary report for the review team
Clarify design intent when changes are still cheap
02 / Resolve early

Clarify design intent when changes are still cheap

An RFI raised in the field is expensive. The same question caught in preconstruction is a clarification, addendum, or detail revision. Nomic gives project teams a structured list of issues to resolve before packages go out.

  • Prioritize findings that are likely to stop work or delay procurement
  • Share cited reports with design, estimating, and construction teams
  • Track which ambiguities were resolved before construction start
Answer the RFIs that still arrive with project research
03 / Same research layer

Answer the RFIs that still arrive with project research

Anticipation does not eliminate every RFI. When questions still arrive, the same Nomic project research layer searches drawings, specs, and correspondence to surface cited answers that support a fast, accurate response.

  • Research RFI questions against the indexed project document set
  • Return cited answers with sheet and specification references
  • Keep anticipation and response workflows in one project knowledge base
Outcomes

What teams get from this workflow

Fewer field RFIs

Resolve predictable questions in preconstruction instead of discovering them after mobilization.

Clearer bid and issuance packages

Hand estimators and contractors packages with fewer ambiguities that inflate contingency or generate change orders.

Faster answers when RFIs still arrive

Use the same project research capability to support RFI responses with cited drawing and specification references.

Questions about this active project research workflow

Answers to common questions about this workflow.

How is RFI Anticipator different from answering RFIs?

RFI Anticipator runs before construction to find missing, ambiguous, or conflicting information that typically becomes an RFI. RFI response research helps after an RFI arrives by surfacing cited answers from the project document set.

What documents does RFI Anticipator review?

It reviews construction drawings and specifications in the project space, and can use additional context such as prior RFIs, correspondence, or reports when teams provide them.

What output does RFI Anticipator produce?

It produces cited findings, supporting inventories, and a summary report that project teams can use to clarify design intent before bid, issuance, or construction start.

AURECON
Aurecon Logo

"Nomic empowers us to build and deploy domain-specific AI to our whole global design team."

Dave Mackenzie
Dave Mackenzie

Managing Principal Digital

+30%

Productivity Increase

+20%

Engineering Capacity Increase