nPlan

nPlan is AI for construction schedules that forecasts uncertainty on every activity using 750,000+ past schedules, with tools to build, check, and question programmes.

Definition

Since 2017, nPlan has trained its forecasting engine on more than 750,000 historical schedules that the company says represent over $2 trillion of construction spend. Teams upload a schedule exported from Oracle Primavera P6, Asta Powerproject, or Microsoft Project, and nPlan forecasts the uncertainty of each activity rather than only a rolled-up finish date, an approach it calls AI-SRA as an alternative to a traditional QSRA. Insights serves single project teams, Portfolio covers owners and programme leads watching many projects, and the Schedule Integrity Checker runs checks that go beyond the DCMA 14-point assessment. Schedule Studio generates logic-linked, editable schedules from a scope document or brief. Barry, the project controls AI agent, runs on nPlan's own Infrastructure, Construction and Engineering Language Model (ICE-LM) and can summarize integrity issues, explain critical and sub-critical paths, compare revisions, and match a risk register to the schedule. The company has also demonstrated Decision Intelligence for scenario modeling and Barry Live for meetings.

In Depth

Most schedule risk analysis starts with a workshop: planners and project leads assign three-point durations to activities, often to a rolled-up summary schedule, and a Monte Carlo run produces a P50 and P80. nPlan replaces the opinion part of that process with a model trained on more than 750,000 past schedules. You upload the working schedule as it is, without rolling it up, and nPlan forecasts a duration range for every activity based on how similar activities performed on past projects. The output shows where risk sits, including on paths far from the deterministic critical path that a planner might not be watching.

The product line maps to different people on a capital program. A planner uses Insights or the Schedule Integrity Checker to clean up logic, open ends, and constraint problems before a submission. An owner's programme team uses Portfolio to spot systemic risk across dozens of schedules. Schedule Studio targets the front end of a project, drafting a logic-linked, editable schedule from a scope document that a planner then refines. Barry, the language model agent, sits across all of it and turns forecasts, integrity findings, and revision comparisons into text that can go straight into a monthly report.

When evaluating nPlan, ask how its forecasts compare with your own historical outcomes on similar work, how it handles schedules with heavy constraints or level-of-effort activities, and how the AI-SRA output would be accepted by the owner or lender who currently expects a QSRA. It is also worth confirming how the company handles the historical schedules it receives from clients, since that dataset is central to how the product works.

Examples

1

Uploading a P6 baseline and seeing which activities far off the deterministic critical path carry the most forecast delay risk

2

Asking Barry to write a plain-English summary of what changed between schedule revision 7 and revision 8 for the monthly owner report

3

Using Schedule Studio to draft a logic-linked schedule for a new substation from the scope document, then refining it before the first submission

Tools Like nPlan

See how nPlan ranks against other tools for the same work, and where each one fits:

Best AI for Construction Scheduling and Primavera P6 in 2026

A ranked comparison of the tools teams use for this work in 2026.

Frequently Asked Questions

Since 2017, nPlan has trained its forecasting engine on more than 750,000 historical schedules that the company says represent over $2 trillion of construction spend. Teams upload a schedule exported from Oracle Primavera P6, Asta Powerproject, or Microsoft Project, and nPlan forecasts the uncertainty of each activity rather than only a rolled-up finish date, an approach it calls AI-SRA as an alternative to a traditional QSRA. Insights serves single project teams, Portfolio covers owners and programme leads watching many projects, and the Schedule Integrity Checker runs checks that go beyond the DCMA 14-point assessment. Schedule Studio generates logic-linked, editable schedules from a scope document or brief. Barry, the project controls AI agent, runs on nPlan's own Infrastructure, Construction and Engineering Language Model (ICE-LM) and can summarize integrity issues, explain critical and sub-critical paths, compare revisions, and match a risk register to the schedule. The company has also demonstrated Decision Intelligence for scenario modeling and Barry Live for meetings.

Uploading a P6 baseline and seeing which activities far off the deterministic critical path carry the most forecast delay risk. Asking Barry to write a plain-English summary of what changed between schedule revision 7 and revision 8 for the monthly owner report. Using Schedule Studio to draft a logic-linked schedule for a new substation from the scope document, then refining it before the first submission.

More AEC Tools Terms

View all

Add AI to your nPlan workflow

Nomic is purpose-built AI for architecture, engineering, and construction. Connect your project data and start getting answers in minutes.

nPlan Review: AEC Tool Overview & AI Alternatives | Nomic