A grounding plan is a short drawing that touches every other electrical sheet: the service, the transformers, the building steel, the telecom rooms, and the lightning protection all bond to it. Nomic drafts grounding and earthing plans in CAD from the power plans, the one-line diagram, and the structural grid, places the electrodes, ring, and ground bars, and checks each conductor size against the code edition you name.

Last reviewed: November 2026

You send

  • Power plans and the one-line diagram
  • Site plan and the structural column grid
  • Telecom and lightning protection drawings, if any
  • Your grounding details and the code edition or wiring rules

Nomic hands back

  • A grounding plan as DWG on your layers and in your title block
  • A grounding conductor schedule in Excel and on the sheet
  • Grounding details for rods, test wells, and ground bars
  • Plotted PDFs with changes clouded and open questions listed
1234567ABCDATA HALL101DATA HALL102DATA HALL103DATA HALL104DATA HALL105DATA HALL106DATA HALL107ELECTRICAL108ELECTRICAL109DATA HALL110ELECTRICAL111STAIRS2LP-2A-1LP-2A-3LP-2A-5LP-2A-7LP-2A-9LP-2A-11LP-2A-13LP-2A-15LP-2A-17LP-2A-19LP-2A-21LP-2A27'-3"27'-0"27'-3"27'-3"27'-0"27'-3"94'-8"1APOWER PLANSCALE: 1/8" = 1'-0"N1234CONSULTING ENGINEERSREVISIONS1ISSUED FOR REVIEWPROJECTASHBURN DC-3SCALE1/8" = 1'-0"DATE06/07/2026KEY PLANSHEET TITLEPOWER PLANSHEET NUMBERE-101

On the sheet

Power Plan, annotated

An electrical power plan drawn over the architectural background, with receptacles circuited back to the panel.

  1. 1Duplex receptacle on the wall it serves
  2. 2Branch circuit wiring between devices
  3. 3Homerun arrow with panel and circuit number
  4. 4Panelboard the circuits return to

The problem

Every bond on the plan depends on another sheet

The grounding electrode conductor is sized from the service conductors on the one-line diagram. The supplemental bonding to building steel follows the structural column grid. The telecom ground bars sit in rooms on the technology plans, and the lightning protection down conductors land on the roof plan. A grounding plan is drawn by taking all of that from other sheets, and it goes stale whenever any of them change.

The mistakes are quiet ones that inspectors and commissioning agents find late: a transformer added on the one-line with no grounding electrode conductor on the plan, a ground bar in a telecom room that moved, a conductor size that no longer matches the service, or an earthing detail copied from a project in another country with different wiring rules.

01 / Layout

Electrodes, ring, and bonds drawn on the site and floor plans

Nomic draws the ground ring, rods, and test wells on the site plan, the bonds to building steel at the column grid, and the ground bars in each electrical and telecom room. Every bond is tagged to the equipment it serves on the power plans and the one-line diagram.

  • Ground ring, rods, and test wells drawn on the site plan
  • Bonds to building steel placed at the column grid
  • Main and telecom ground bars placed in each room
02 / Size

Conductor sizes taken from the one-line diagram

Nomic reads the service and each separately derived system from the one-line diagram and sizes the grounding electrode conductors, bonding jumpers, and equipment grounding conductors from the tables in the code you name. A size that changes on the one-line reaches the grounding plan and its schedule.

  • Grounding electrode conductors sized from the service conductors
  • Each transformer grounded and bonded as a separately derived system
  • Sizes in a schedule on the sheet and in Excel
03 / Check

Checked against the code edition and standards you name

Before the plan goes to your engineer, Nomic checks it against the code edition you name, or the local wiring rules for projects outside the United States. Every change is clouded, and anything it could not confirm, such as soil resistivity or a utility requirement, is listed for the engineer of record.

  • Electrode system checked against NEC 250.50 and 250.52
  • Separately derived systems checked for a bonding jumper and GEC
  • Local earthing rules applied where you name them

Checked against

The code and documents behind every sheet

Name the editions the project is designed to and Nomic checks its own drawing against them before handing it back. Your engineer or architect of record makes the final call and stamps the set.

  • NEC Article 250 grounding and bonding
  • IEEE 142 grounding of industrial and commercial power systems
  • IEEE 80 for substation ground grids
  • ANSI/TIA-607 telecommunications bonding
  • BS 7671, BS 7430, or IEC 60364 where they apply

How it works

From a sentence to a stamped set

  1. Step 1

    Ask for the drawing

    Say what the sheet needs to show and attach the backgrounds, markups, cutsheets, or photos. A sentence is enough to start.

  2. Step 2

    Nomic drafts it in CAD

    Nomic works in CAD on its own computer and saves real DWG files to the project, or in your open AutoCAD drawing or Revit model through its add-ins. Either way it uses your layers and blocks and follows how your firm drew the same thing before.

  3. Step 3

    Nomic checks its own work

    The drawing is checked against the code editions you name and the source documents. Everything Nomic drew is clouded, and open questions are listed.

  4. Step 4

    Your team reviews and stamps

    Your engineers and architects review the clouded changes, make the final call, and issue the set under their own stamp.

FAQ

Frequently asked questions

Yes. Nomic drafts grounding and earthing plans in CAD from the power plans, the one-line diagram, and the structural grid. It draws the ring, rods, bonds, and ground bars and saves a DWG on your layers.

Nomic reads the service and feeder conductors from the one-line diagram and sizes grounding electrode conductors and equipment grounding conductors from the NEC tables, such as Table 250.66 and Table 250.122. Each size is listed in a schedule with its source.

Nomic drafts the ground grid layout your engineer designs and checks the drawing for completeness. Grid spacing, step and touch potential, and resistance targets depend on soil data and engineering judgment under IEEE 80, and stay with the engineer of record.

Yes. Name the wiring rules that apply, such as BS 7671 with BS 7430, or IEC 60364, and Nomic uses their terms, conductor sizes, and earthing arrangements in place of the NEC.

Both. With the Nomic add-ins for AutoCAD and Revit, the Nomic agent works in the drawing or model your team has open, with your approval before each change. Nomic can also draft on its own computer and save DWG files that open in AutoCAD or any DWG editor.
AI Grounding Plans: Grounding and Earthing Layouts in CAD | Nomic