The load path from roof to ground
A lateral load starts as wind pressure on the facade or inertia in the mass of the floors. The facade or the floor deck passes it into the diaphragm, which acts like a deep horizontal beam spanning between the vertical elements. Collectors, sometimes called drag struts, gather the force along the diaphragm and deliver it into the walls or frames. The vertical element carries it to the foundation, and the foundation resists sliding and overturning.
A break anywhere in that chain is a problem, even when every member is strong. A shear wall that stops at the second floor, a diaphragm opening that cuts off a collector, and a frame column that lands on a transfer girder each change how the force travels.


