Does Nomic edit Revit models?
Not today. Nomic produces the deliverables that go into Revit: DWG drawings drawn on your model's grid to link into the model, and change lists and schedules in Excel. Your team makes the model edits.
Point Nomic at the coordination comments and it draws the changes as a DWG your team links into the Revit model, lists every edit for your modeler, and checks the drawing against the comments.
Task Nomic with anything...
Illustrative project, sped up. Click any file to open it.
Comments go in, a DWG and a change list for the model come out.
Changes are drawn, sized, and listed the same day they are found.
Every change is checked against the comment that asked for it.
Coordination finds the problem in minutes. Turning it into model work takes days: someone has to work out each change, draw it, size it, and hand the modeler a list they can follow.
Nomic drafts the changes in CAD on the model's grid and level origin, so the DWG lines up when it is linked into Revit. It writes a change list with sizes and grid locations for the modeler, and checks the drawing against the original comments.
1" filtered CW to espresso and brewer Markup 1
Sink HW branch resized to 3/4" Markup 2
Drawn on the model grid, Level 1 origin P-201
Reroutes, resizes, and new equipment drawn in CAD on the model's grid and origin, with the changes clouded and tagged.
Every edit with its size and grid location in Excel, so the model update takes minutes instead of a day of redlines.
Does the DWG match the coordination markups?
Nomic reviews the drawing against the coordination comments before it reaches your modeler.
Answers to common questions about this workflow.
Not today. Nomic produces the deliverables that go into Revit: DWG drawings drawn on your model's grid to link into the model, and change lists and schedules in Excel. Your team makes the model edits.
Nomic draws on the grid and level origin from your current sheets, so the DWG lines up when it is linked into the model. Tell it your layer standards and it uses them.
Yes. The changes are clouded and tagged on the DWG, and the change list names each one with its size, grid location, and the markup it came from.