Reviews and drafting at Kohler Ronan, with Nomic
For architects, designers, and engineers at Kohler Ronan looking at Nomic. This guide ties the services and project types Kohler Ronan lists on its own website to what Nomic produces: cited first-pass reviews and drafted sheets that a practitioner checks before anything is issued.
Last reviewed 2026-11-21. Not affiliated with Kohler Ronan.
Illustrative building systems
What reviews and drafting look like for Kohler Ronan teams
Each outcome below is tied to a service or project type Kohler Ronan lists publicly. Nomic does the first pass or the first draft, and the practitioner who owns the drawings, specifications, or submittals checks the result and makes the final call.
- Submittal review01
Each submittal reaches the reviewer with a first pass drafted
Kohler Ronan lists Construction Administration alongside its MEP/FP design, including shop drawing review against design intent. Nomic cross-references each shop drawing and product data sheet against the project specifications and drawings, then drafts a first-pass review and a starting submittal log for the engineer to check before anything goes back to the contractor.
How submittal review works - Specification review02
Drawing and specification conflicts surface before a set goes out
Kohler Ronan says its coordinated approach across disciplines leads to comprehensive designs and specifications. Nomic answers questions about a specification section with the page cited, maps what an addendum changed, and flags places where the drawings and the specification disagree, so the engineer can resolve each one.
How specification review works - Drafting03
Redlines and routine drafting come back as DWGs on the firm’s standards
Kohler Ronan describes documenting existing building systems in color-coded sketches and equipment and system schedules. A team can ask Nomic for an equipment schedule in a sentence, and Nomic saves DWGs on the layers and title blocks the team sets up, clouded for the engineer to review.
How drafting works
The same reviews and drafting, played on an illustrative project
These sessions use made-up projects, not Kohler Ronan files. Each one runs from the request to the result a practitioner checks, with the sheets and pages it relied on cited.
Linden Library/New Session
Task Nomic with anything...
- AskHand over the whole queue
- WorkTwelve packages in parallel
- DeliverOnly what needs judgment
- CheckEvery finding traceable
Illustrative project, sped up. Click any file to open it.
What Kohler Ronan says about its practice
Kohler Ronan describes itself as a multi-disciplined engineering consultancy providing mechanical, electrical, plumbing, fire protection, and technology design, with energy analysis and commissioning offered in house.
- Services
- Mechanical, Electrical, Plumbing, and Fire Protection (MEP/FP), Construction Administration (CA), Technology Design, Energy Analysis, Sustainable Design, Commissioning Services, Building Evaluations, Master Planning
- kohlerronan.com/services
Security and access, for the team running the evaluation
Files stay where they are
Nomic connects to the systems that already hold project files, such as SharePoint, Egnyte, Autodesk Forma, and Procore, and enforces the permissions set there.
No training on project files
Nomic has zero-data-retention agreements with its AI providers. Project content is processed for inference, discarded, and never used to train their models.
SOC 2 Type II and SSO
Nomic is SOC 2 Type II certified and pen-tested annually. A firm can set up single sign-on through its identity provider with SAML or OIDC.
Hosting by region
Each firm gets its own Nomic-managed environment on AWS, hosted in the EU, Australia, the US, or the UK.
A practitioner at Kohler Ronan can start for free on their own project files. A team that wants to try Nomic across a project can book a demo to plan a pilot.
Questions and answers
No. Nomic wrote this page from information Kohler Ronan publishes on its own website, and each fact links to its source. Kohler Ronan has not reviewed or endorsed this page. To ask for a correction or for the page to be removed, email support@nomic.ai.
Based on the services and project types Kohler Ronan lists publicly, the closest outcomes are these: each submittal reaches the reviewer with a first pass drafted, drawing and specification conflicts surface before a set goes out, and redlines and routine drafting come back as DWGs on the firm’s standards. Every review is a first pass, and the practitioner who owns the drawings makes the final call. A team can try Nomic on its own project files.
No. Nomic has zero-data-retention agreements with Anthropic, OpenAI, and Google Cloud Vertex AI. Project content is processed for inference and discarded, and it is never used to train their models.
Nomic does not keep a separate permission system. Nomic enforces the access controls already set in the systems that hold the files, such as SharePoint, Egnyte, Autodesk Forma, and Procore. If a practitioner cannot open a folder there, that practitioner cannot see it in Nomic.
A practitioner can start for free at app.nomic.ai and run Nomic on their own project files. A team that wants to try Nomic across a project or a studio can book a demo with Nomic to plan a pilot.


