Firm guide

Reviews and drafting at Hazen and Sawyer, with Nomic

For architects, designers, and engineers at Hazen and Sawyer looking at Nomic. This guide ties the services and project types Hazen and Sawyer lists on its own website to what Nomic produces: cited first-pass reviews and drafted sheets that a practitioner checks before anything is issued.

Last reviewed 2026-11-21. Not affiliated with Hazen and Sawyer.

Drawing review, first pass

Illustrative treatment plant

Outcomes

What reviews and drafting look like for Hazen and Sawyer teams

Each outcome below is tied to a service or project type Hazen and Sawyer lists publicly. Nomic does the first pass or the first draft, and the practitioner who owns the drawings, specifications, or submittals checks the result and makes the final call.

  1. Drawing review01

    Senior review starts from a cited first pass

    Hazen and Sawyer lists Structural Engineering, Electrical Design, and HVAC, Plumbing, and Fire Protection alongside its treatment process work, so one treatment plant set can carry sheets from several disciplines. Nomic runs a first pass on that set against the QA/QC checklist a team picks and flags inconsistencies between sheets, each finding cited, for the engineer to decide on.

    How drawing review works
  2. Specification review02

    Drawing and specification conflicts surface before a set goes out

    Hazen and Sawyer lists treatment technologies such as Membranes and Dissolved Air Flotation, and a plant project that adds equipment like this usually includes specification sections for it. Nomic answers questions about a section with the page cited, maps what an addendum changed, and flags places where the drawings and the specification disagree.

    How specification review works
  3. Drafting03

    Redlines and routine drafting come back as DWGs on the firm’s standards

    Hazen and Sawyer lists Pump Stations among its solutions, and pump station drawings go through rounds of review comments like any plan set. Nomic takes a drafting request in a sentence, such as picking up a round of redlines, and saves DWGs on the layers and title blocks a team sets up, clouded for the engineer to check.

    How drafting works
See it run

The same reviews and drafting, played on an illustrative project

These sessions use made-up projects, not Hazen and Sawyer files. Each one runs from the request to the result a practitioner checks, with the sheets and pages it relied on cited.

Linden Street Library/New Session

Hey Jordan, what are we building today?
Linden Library 90% CD Set.pdfQA-QC Checklist Rev 4.pdf

Task Nomic with anything...

Auto
Learn more
  1. AskYour checklist, your set
  2. WorkSet-wide page agents
  3. DeliverTriaged for senior review
  4. CheckMarked up on the sheet

Illustrative project, sped up. Click any file to open it.

Public information

What Hazen and Sawyer says about its practice

Hazen and Sawyer describes itself as an employee-owned firm focused exclusively on water, delivering practical solutions that protect public health and the environment.
Source: hazenandsawyer.com/75-years
Services
Structural Engineering, Electrical Design, HVAC, Plumbing, and Fire Protection, BIM Modeling, Pump Stations, Membranes, Dissolved Air Flotation, Pilot Testing, Computational Fluid Dynamics (CFD) Modeling, Stormwater System Modeling, Geographic Information Systems (GIS)
hazenandsawyer.com/search
Project types
Drinking Water, Wastewater, Reuse, Water Resources
hazenandsawyer.com
For the evaluation

Security and access, for the team running the evaluation

Read the security details

Files stay where they are

Nomic connects to the systems that already hold project files, such as SharePoint, Egnyte, Autodesk Forma, and Procore, and enforces the permissions set there.

No training on project files

Nomic has zero-data-retention agreements with its AI providers. Project content is processed for inference, discarded, and never used to train their models.

SOC 2 Type II and SSO

Nomic is SOC 2 Type II certified and pen-tested annually. A firm can set up single sign-on through its identity provider with SAML or OIDC.

Hosting by region

Each firm gets its own Nomic-managed environment on AWS, hosted in the EU, Australia, the US, or the UK.

A practitioner at Hazen and Sawyer can start for free on their own project files. A team that wants to try Nomic across a project can book a demo to plan a pilot.

Questions

Questions and answers

No. Nomic wrote this page from information Hazen and Sawyer publishes on its own website, and each fact links to its source. Hazen and Sawyer has not reviewed or endorsed this page. To ask for a correction or for the page to be removed, email support@nomic.ai.

Based on the services and project types Hazen and Sawyer lists publicly, the closest outcomes are these: senior review starts from a cited first pass, drawing and specification conflicts surface before a set goes out, and redlines and routine drafting come back as DWGs on the firm’s standards. Every review is a first pass, and the practitioner who owns the drawings makes the final call. A team can try Nomic on its own project files.

No. Nomic has zero-data-retention agreements with Anthropic, OpenAI, and Google Cloud Vertex AI. Project content is processed for inference and discarded, and it is never used to train their models.

Nomic does not keep a separate permission system. Nomic enforces the access controls already set in the systems that hold the files, such as SharePoint, Egnyte, Autodesk Forma, and Procore. If a practitioner cannot open a folder there, that practitioner cannot see it in Nomic.

A practitioner can start for free at app.nomic.ai and run Nomic on their own project files. A team that wants to try Nomic across a project or a studio can book a demo with Nomic to plan a pilot.

A Guide for Hazen and Sawyer Teams Evaluating Nomic