Firm guide

Reviews and drafting at Bartlett & West, with Nomic

For architects, designers, and engineers at Bartlett & West looking at Nomic. This guide ties the services and project types Bartlett & West lists on its own website to what Nomic produces: cited first-pass reviews and drafted sheets that a practitioner checks before anything is issued.

Last reviewed 2026-11-21. Not affiliated with Bartlett & West.

Drawing review, first pass

Illustrative treatment plant

Outcomes

What reviews and drafting look like for Bartlett & West teams

Each outcome below is tied to a service or project type Bartlett & West lists publicly. Nomic does the first pass or the first draft, and the practitioner who owns the drawings, specifications, or submittals checks the result and makes the final call.

  1. Drawing review01

    Senior review starts from a cited first pass

    Bartlett & West lists architecture, structural, and mechanical, electrical and plumbing services alongside its water, wastewater, and transportation work. When a set carries sheets from several of those disciplines, Nomic flags inconsistencies between sheets in a first pass against the QA/QC checklist a team chooses, with each finding cited for the reviewer.

    How drawing review works
  2. Submittal review02

    Each submittal reaches the reviewer with a first pass drafted

    Design-build and construction and survey are both on the Bartlett & West service list. Nomic cross-references shop drawings and product data against the project specifications and drawings and drafts a first-pass review and a starting submittal log, so the engineer starts from a draft and makes the final call.

    How submittal review works
  3. Drafting03

    Redlines and routine drafting come back as DWGs on the firm’s standards

    Bartlett & West lists offices in Florida, Illinois, Kansas, Missouri, North Dakota, South Dakota, and Texas, with its headquarters in Topeka. Nomic takes a drafting request in a sentence, such as picking up a round of redlines, and saves DWGs on the layers and title blocks a team sets up, clouded for the engineer to check.

    How drafting works
See it run

The same reviews and drafting, played on an illustrative project

These sessions use made-up projects, not Bartlett & West files. Each one runs from the request to the result a practitioner checks, with the sheets and pages it relied on cited.

Linden Street Library/New Session

Hey Jordan, what are we building today?
Linden Library 90% CD Set.pdfQA-QC Checklist Rev 4.pdf

Task Nomic with anything...

Auto
Learn more
  1. AskYour checklist, your set
  2. WorkSet-wide page agents
  3. DeliverTriaged for senior review
  4. CheckMarked up on the sheet

Illustrative project, sped up. Click any file to open it.

Public information

What Bartlett & West says about its practice

Bartlett & West describes itself as a 100 percent employee-owned engineering firm committed to helping clients build stronger, smarter, more connected infrastructure, with a purpose to lead its communities to a better tomorrow.
Source: bartlettwest.com/about
Headquarters
Topeka, KS
bartlettwest.com/locations
Services
Architecture, Asset Management, Construction & Survey, Design-Build, Environmental Planning, Funding & Grants, GIS, Mechanical, Electrical and Plumbing, Oil & Gas, Operations, Power Delivery, Public Information, Rail Services, Renewable Energy, Site Development, Stormwater, Structural, Transportation, Wastewater, Water
bartlettwest.com/services
Offices
Topeka, KS, Tampa, FL, Jerseyville, IL, Lawrence, KS, Manhattan, KS, Overland Park, KS, Jefferson City, MO, Rolla, MO, Springfield, MO, St. Louis, MO, Bismarck, ND, Rapid City, SD, Sioux Falls, SD, Dallas, TX, El Paso, TX, Fort Worth, TX, San Antonio, TX, Tyler, TX
bartlettwest.com/locations
For the evaluation

Security and access, for the team running the evaluation

Read the security details

Files stay where they are

Nomic connects to the systems that already hold project files, such as SharePoint, Egnyte, Autodesk Forma, and Procore, and enforces the permissions set there.

No training on project files

Nomic has zero-data-retention agreements with its AI providers. Project content is processed for inference, discarded, and never used to train their models.

SOC 2 Type II and SSO

Nomic is SOC 2 Type II certified and pen-tested annually. A firm can set up single sign-on through its identity provider with SAML or OIDC.

Hosting by region

Each firm gets its own Nomic-managed environment on AWS, hosted in the EU, Australia, the US, or the UK.

A practitioner at Bartlett & West can start for free on their own project files. A team that wants to try Nomic across a project can book a demo to plan a pilot.

Questions

Questions and answers

No. Nomic wrote this page from information Bartlett & West publishes on its own website, and each fact links to its source. Bartlett & West has not reviewed or endorsed this page. To ask for a correction or for the page to be removed, email support@nomic.ai.

Based on the services and project types Bartlett & West lists publicly, the closest outcomes are these: senior review starts from a cited first pass, each submittal reaches the reviewer with a first pass drafted, and redlines and routine drafting come back as DWGs on the firm’s standards. Every review is a first pass, and the practitioner who owns the drawings makes the final call. A team can try Nomic on its own project files.

No. Nomic has zero-data-retention agreements with Anthropic, OpenAI, and Google Cloud Vertex AI. Project content is processed for inference and discarded, and it is never used to train their models.

Nomic does not keep a separate permission system. Nomic enforces the access controls already set in the systems that hold the files, such as SharePoint, Egnyte, Autodesk Forma, and Procore. If a practitioner cannot open a folder there, that practitioner cannot see it in Nomic.

A practitioner can start for free at app.nomic.ai and run Nomic on their own project files. A team that wants to try Nomic across a project or a studio can book a demo with Nomic to plan a pilot.

A Guide for Bartlett & West Teams Evaluating Nomic