Nomic
Case Study: AZ Engineering Consultants
How AZ Engineering Consultants uses Nomic to draft CAD deliverables from first input to final review
A New York MEP firm gives Nomic site photos, plans, and client standards, and Nomic drafts survey reports and lighting control diagrams in CAD. A licensed engineer checks every drawing.
4–8 hrs → 1.5–2 hrs
Engineer time on a CAD survey report, review included
8–12 hrs
To draft lighting control diagrams by hand, now drafted by Nomic in CAD
90%
Of the lighting control diagrams drafted from one prompt, before cleanup
Challenge
AZ Engineering Consultants is a New York City MEP, fire protection, and commissioning firm with a team of eight licensed professional engineers and engineers in training. Its projects range from ground-up residential to retail, tenant fit-outs, and mixed use. Everyone on the team, principals included, does some drafting or 3D modeling, mostly in Revit, with AutoCAD for smaller projects and for deliverables like survey reports.
Co-founder and Principal Sean Hornbuckle, P.E., sees drafting and modeling as the part of a project where the engineering decisions are already made. The intent is in the plans and in the engineer’s head, and what remains is getting every duct, circuit, and pipe into the drawing, lined up, labeled, cross-referenced, and marked with the right symbols. AZ keeps that work in house instead of offshoring it, so the hours come out of licensed engineers’ days.
Site surveys are where that cost shows most, measured against what AZ charges for them. After a walk through a tenant space, the team drafts a floor plan in CAD annotated with the domestic water entry, the electrical panels, and the rest of the equipment, plus a key that ties each item to the right photos from a visit that can produce hundreds. Clients usually expect the report within three to five business days, and on a tenant fit-out the drawings can be ready to stamp and permit in as little as four weeks after the survey. Drafting the report after the survey typically took four to eight hours.
Before Nomic, AZ tried a few general-purpose AI tools for drafting and general engineering help. Hornbuckle described how they held up:
“Some of them were okay, but the problem with our line of work is, okay is unacceptable.”
His reason is that AZ is financially and legally liable for everything it issues, and holds itself to a high standard for its clients. A tool that is sometimes wrong, with no way to verify its findings, is not worth using, and he would rather do the work himself and be sure.
Approach
On a recent survey of a tenant space, Hornbuckle visited the site himself. He gave Nomic the owner’s outline of the space as a PDF, the broker’s lease plan, a CAD drawing, the owner’s work letter listing what the owner will provide the tenant, more than 180 photos from the roof and the space, and the scratch markup he drew on an iPad during the walk. He asked Nomic for a survey report showing every MEP element, as both a PDF and a DWG. Nomic ran for a little over an hour, and he worked on other projects in the meantime.
Nomic drafted the floor plan in CAD to scale, and Hornbuckle confirmed the scale in Bluebeam. From the photos and his markup, it placed the rooftop units (RTUs), the domestic water entry, and the electrical panels in the drawing, inside and outside. A sprinkler double check valve assembly and the fire alarm control panel sat in a remote room, and Nomic accurately marked them as off plan instead of placing them nearby. For each RTU, it read the name, model number, tonnage, and serial number from the photos, then ran a web search to find the unit’s year of manufacture, which the photos did not show.
Every item has a photo key listing the photos that show it. The report also includes an HVAC unit schedule, which Hornbuckle checked and found accurate, a summary of deficiencies, and a list of every item sorted by trade, from electrical to plumbing and fire protection. Nomic compared what is in the space against what the work letter promises and what the tenant needs, including the existing gas service and the HVAC tonnage, and flagged where the space fell short. Each requirement in that comparison cites the work letter, so Hornbuckle can open the source with one click. Those gaps are what he takes back to the client, who can work them into the lease deal or decide the space is the wrong one.
Hornbuckle reviews the report in Nomic’s viewer as the licensed professional on the project. Nomic cites its findings, he can see how it reached them, and he can ask it questions about any of them. On this survey, a few notes needed rewording or removing, and some overlapping notes needed to move before the report was ready for the client.
“I just have the extra degree of confidence that it is right because there’s citations. I got to see how it did its work. I’m able to check everything.”
Hornbuckle also works with the Nomic team. This account covers how AZ uses Nomic on its own projects, and the hour figures are his own estimates.
Lighting control diagrams
Some AZ clients want detailed lighting control diagrams: schedules for control zones, scenes, and equipment, plus riser diagrams and emergency fixture diagrams. For a new client with its own lighting control standard, Hornbuckle gave Nomic two inputs. One was his lighting layout, showing the fixtures, the control zones, and the fixture schedule. The other was the client’s 20-page PDF describing the control equipment it uses and how it wants scenes and timing set up. Apart from looking up cut sheets, those two inputs are everything an engineer on his team would need to draw the diagrams.
From one prompt, Nomic drew the control zone, scene, and equipment schedules and the riser diagrams in CAD and PDF, working from the equipment cut sheets, coloring the diagrams, and adding the notes. Hornbuckle estimates that first pass got the diagrams 90 percent of the way there. He traced the result zone by zone, from each lighting controller to the fixtures it serves and to the emergency power inverter that keeps the emergency lights on in an outage.

“I went through it. It’s correct. It was able to understand the cut sheets, understand how the diagrams have to be, to color it properly, to add the notes in there.”
The first pass still had some errors, but instead of correcting each one, he gave Nomic general direction, such as making sure every lighting controller in an area connects to the inverter. Four or five short prompts finished the cleanup, from rearranging diagrams to adding colors.
Hornbuckle estimates diagrams like these take eight to 12 hours to draft properly by hand. With Nomic, his part of the drafting was three to five minutes to give it the inputs, plus the cleanup prompts, and he worked on other projects during the roughly 30 minutes the first prompt ran. Either way, he reviews the finished diagrams after the drafting is done, and that review takes as long as it always has, so the hours saved all come out of the drafting.
The diagrams also carry over to later projects. When the next project for this client has a different run of tape lighting or different pendants, Nomic updates the diagrams from the new inputs. He says tools like this let AZ “give a higher level of deliverable to our client.”
Working with Nomic
Hornbuckle reviews Nomic’s drawings the way he reviews his team’s. He still works in CAD and Revit himself, and when he reviews a drawing, he marks it up in Bluebeam with arrows and notes for the engineer who drafted it. With Nomic, he exports the PDF, marks it up in Bluebeam, gives the markup back to Nomic, and Nomic updates the drawing. He keeps those red lines in his project files so a later session doing similar work can use them.
“Now I’m basically interacting with the Nomic agent the exact way that I interact with my junior engineers, which is nice because it’s a very natural workflow, which is what I want. I don’t want to have to do something different to make Nomic work well. I just want to do what I do and Nomic meet me there.”
He holds Nomic’s drawings to the same standards as his team’s: no overlapping text, all the required information, and everything in the right spot. Like a junior engineer’s first draft, a first draft from Nomic usually needs a round of red lines before it meets those standards. After that, Hornbuckle and AZ’s other co-founder give every set of plans a thorough final review before it goes out, as they do for all of AZ’s work.
Hornbuckle often has several Nomic sessions running at once while he works on other projects, so how long a session runs matters less to him than the cost and his own time. A person still decides when to start a session, because a session started before all the inputs are in has to be run again. In his words, “the most important part of the human is deciding when all of the right inputs are there.”
Outcome
Hornbuckle estimates his own time on a survey report at an hour and a half to two hours, covering prompting Nomic, reviewing the drafts, and adjusting them. He already reviews his junior engineers’ drafts, so the review adds no new work.
He considers the finished report higher quality than one he would have drafted by hand. Nomic formatted the report and captioned each item clearly, so it arrived in a state that was easy to review and edit. Nomic also did much of the checking of the survey report on its own: it tied each item to its photos, compared the existing services against the work letter, and flagged the deficiencies worth raising with the client. He then verified those findings against the photos himself, so every finding was checked twice, once by Nomic and once by him.
AZ charges a fixed fee for a survey, so the hours saved stay with the firm. His team’s reaction was positive: the same fee now covers less drafting time, which widens the margin on each survey and gives each engineer more of the week for higher-value engineering work.
For the engineers on his team, the change shows up as less repetitive work: less drafting by hand, fewer code sections looked up manually, and less time spent organizing and formatting survey reports. Rodney Kendall, P.E., a senior project manager at AZ, described it this way:
“I can feel the weight lifting off my shoulders.”
The larger change is capacity. AZ’s first priority is issuing plans to its clients that are high quality, thoroughly reviewed, efficient, and code compliant. Before Nomic, when clients reached out with a new project, Hornbuckle sometimes had to turn it down because the team did not have the capacity to deliver that quality. With Nomic drafting alongside the team, AZ now takes on more of those projects while meeting the same standard.
“I would rather spend that four hours of basically drafting time doing engineering calculations, doing quality review, talking to the clients, double-checking work, improving standards in house. Really the kind of things that require a bit of taste and knowledge and expertise.”